1. Fabrication/Welding
The majority of our steel beams arrive cut to length with all relevant holes pre-drilled or punched.
Qualified boilermakers tack weld base, haunch and all ancillary items into place. Our senior foreman checks all measurements for accuracy before being fully welded.
Single fillet welds, 3 run multi fillets and full penetration butt welds are all performed by our qualified and skilled welding team. All welding procedures conform to AS/NZ 1554.1.2000.
Our workshop is fully equiped with the necessary tools and machinery to complete all fabrication items. B&G have large fabrication tonnage capabilities which depend wholly on complexity of the individual project.
2. Painting/Surface Finishes
After fabrication our finished steel is sent to our blasting and painting partner Hills Blasting & Painting at South Windsor. Hills are Sydney’s premier blasting & painting company.
From a primer finish to a three coat external finish, all are available at Hills and full QA documentation is available with the Hills system.
Hills is a recognized applicator of Dulux Australia and can offer warranties with all work.
All painting procedures conform to AS/NZ 2312.2004
Our preferred Hot dipped galvanizers are Nepean Gal Services at Yagoona, Sydney.
3. Transport
Structural steelwork and all ancillary items are preloaded onto trailers in preparation for site delivery.
Steel purlins are delivered direct to site by the manufacturer.
Extreme care is taken in loading and unloading to minimise paint coating / hot dipped galvanised damage.
4. Site Installation and Project Management
Staging and planning for site erection is paramount. Our project managers are experienced in completing programming co-ordination with all on site traders, deliveries, QA, safety, contract administration and steel erection.
Our erection crews using cranes and boom lifts erect all structural steel columns, rafters, bracing, purlins and all ancillary items to specification.
B&G Management recognises it's responsibility and commitment for the safety and welfare of all parties within the workplace.
Our safety management objective is the prevention of accidents via safety inductions, toolbox talks, site safety management plan with the interaction of SWMS.
5. Completion
B&G are well known in the market place for their reputation and reliability.
Repeat business and satisfied clients are always an indication we are still on the right track as we continue to expand. B&G have the flexibility to complete projects in numerous geographical locations throughout NSW, ACT and QLD.